Glossary · 37 terms

Building Approval and Facade Terms in India

The words a commercial building project in India runs on, from FSI and setbacks to SHGC and jali, explained plainly. Where a term comes from the Tamil Nadu building rules, we say which rule. Where we have used it on a project, we link the project.

New in Tamil Nadu

Two Rule Changes From October 2026

  • G.O. (Ms.) No. 179 · 7 October 2026

    Registered architects and Registered Engineers Grade I can now certify eligible small residential, commercial and industrial proposals for planning permission. What it covers

  • G.O. (Ms.) No. 194 · 26 October 2026

    The permitted height for specified non-high-rise building categories went up from 18.30 m to 19.50 m. More on high-rise buildings

01

Approvals and Building Rules in Tamil Nadu

The words you will meet between buying a site and moving in. Rule numbers refer to the 2019 rules as published; they have been amended since, so check the current rule for your plot.

TNCDBR 2019

The Tamil Nadu Combined Development and Building Rules, 2019: one set of rules for planning and building approvals across the state, issued as G.O. Ms. No. 18 on 4 February 2019. They set the FSI, setbacks, plot coverage, height, parking and fire requirements, and they have been amended several times, most recently in October 2026. Our commercial architecture page explains how approvals fit into a project.

Source: TNCDBR 2019, as published on 4 February 2019

CMDA

The Chennai Metropolitan Development Authority. Under rule 5 of the 2019 rules, it issues planning permission in the Chennai Metropolitan Area, or a local body it has delegated the power to does.

Source: TNCDBR 2019, as published on 4 February 2019

DTCP

The Directorate of Town and Country Planning. Outside the Chennai Metropolitan Area, planning permission comes from the planning authority the Director has delegated, which is why approvals in the rest of Tamil Nadu are usually called DTCP approvals.

Source: TNCDBR 2019, as published on 4 February 2019

Planning permission and building permit

Two separate approvals. Planning permission checks the use, the FSI, the setbacks and the other development rules, and comes from CMDA or the DTCP authority. The building permit, which lets construction start, comes from the local body (rule 5). A feasibility report checks the rules before you buy or lease the land.

Source: TNCDBR 2019, as published on 4 February 2019

Completion certificate

The certificate that a finished building matches its approval. Under rule 20 of the 2019 rules, most buildings need one before they are occupied; small residential buildings and industrial buildings are among the exceptions in that text.

Source: TNCDBR 2019, as published on 4 February 2019

FSI (floor space index)

The total covered area on all floors, less the areas the rules exempt, divided by the plot area. It decides how much floor area a plot can carry: a 1,000 sq m plot with an FSI of 2 can carry 2,000 sq m of floors, over as many storeys as the height and setback rules allow.

Source: TNCDBR 2019, as published on 4 February 2019

Premium FSI

Floor area allowed above the normal FSI on payment of a charge, linked to the width of the road in front of the plot (rule 49). It can change what a site is worth, so it belongs in any feasibility study.

Source: TNCDBR 2019, as published on 4 February 2019

TDR (transferable development rights)

Development potential separated from a plot and given to its owner as a right that can be used elsewhere, in the circumstances the rules set out (rule 48).

Source: TNCDBR 2019, as published on 4 February 2019

Plot coverage

How much of the plot the building covers, measured as its 12-noon shadow and given as a percentage of the plot area, less the exemptions in rule 29.

Source: TNCDBR 2019, as published on 4 February 2019

Setbacks

The open space left between the building and the street alignment or the plot boundaries, at the front, the sides and the rear. The required setbacks grow with the height of the building.

Source: TNCDBR 2019, as published on 4 February 2019

Height of the building

Measured from the formed ground level of the plot at the road, leaving out any ramp, up to the roof of the topmost livable floor.

Source: TNCDBR 2019, as published on 4 February 2019

High-rise building

In the 2019 rules, a building more than 18.30 m tall. High-rise buildings go through extra scrutiny, including fire protection to the National Building Code and a no objection certificate from the Director of Fire and Rescue Services (rule 39). In October 2026, G.O. (Ms.) No. 194 raised the permitted height for specified non-high-rise building categories from 18.30 m to 19.50 m, subject to FSI, road width and setbacks.

Source: King Stubb & Kasiva, 17 November 2026, on G.O. (Ms.) Nos. 179 and 194 of October 2026

Stilt floor

A floor at ground level that is wholly or partly open, with the building raised on columns above it, usually to park cars.

Source: TNCDBR 2019, as published on 4 February 2019

OSR (open space reservation)

Land set aside for a park or playground in larger developments, handed to the local body free of cost (rule 41). In the 2019 rules, sites between 3,000 and 10,000 sq m reserve 10% of the area, excluding roads, or pay its guideline value instead; larger sites follow their own row of the table.

Source: TNCDBR 2019, as published on 4 February 2019

Fire NOC

A no objection certificate from the Director of Fire and Rescue Services, Tamil Nadu, confirming that the fire protection meets the National Building Code of India 2016. The 2019 rules require it for high-rise buildings, among others.

Source: TNCDBR 2019, as published on 4 February 2019

NBC 2016

The National Building Code of India 2016, from the Bureau of Indian Standards. Part 4 deals with fire and life safety, and the Tamil Nadu rules refer to the code for fire protection and lifts.

Third-party certification (new, October 2026)

Under G.O. (Ms.) No. 179 of 7 October 2026, registered architects and Registered Engineers Grade I can certify eligible proposals for planning permission, applied for through the Tamil Nadu Single Window Portal. It covers small residential buildings, commercial buildings with up to 300 sq m of FSI area and 14 m height, and White and Green category industrial buildings with up to 2,500 sq m of FSI area and 18.30 m height in SIDCO, SIPCOT, ELCOT and other approved industrial layouts.

Source: King Stubb & Kasiva, 17 November 2026, on G.O. (Ms.) Nos. 179 and 194 of October 2026

02

Facades and Glass

The words that decide how much of the sun gets into a building, and what it looks like from the road. Where we have used one, the project is linked.

ACP (aluminium composite panel)

Two thin aluminium skins bonded to a core, used to clad buildings with a clean, flat finish. The core matters for fire safety, so specify a fire-rated one. The TNEB Porur control building is clad in ACP.

Curtain wall

A glass and aluminium skin hung from the building’s structure, carrying only its own weight and the wind. Unitised systems arrive as factory-made panels; stick systems are put together on site.

DGU (double glazed unit)

Two panes of glass with a sealed gap between them, which lets much less heat through than a single pane.

Low-E glass

Glass with a thin coating that reflects heat while letting most of the daylight through.

SHGC (solar heat gain coefficient)

The share of the sun’s heat that gets through a window, from 0 to 1. The lower it is, the less heat comes in, which matters a great deal in an Indian summer. Read why all-glass buildings struggle in India’s heat.

VLT (visible light transmittance)

The share of visible light that gets through glass. Good glass for a hot climate keeps the SHGC low and the VLT reasonable, so rooms stay bright without getting hot.

U-value

How easily heat passes through a wall, a roof or a window. The lower the number, the better it insulates.

Fins and louvres

Vertical fins and horizontal louvres that shade the glass. Vertical elements work against the low east and west sun; horizontal projections work against the high sun. On The Orb, fins of reclaimed timber are spaced according to the sun path. More in climate-responsive facades.

Jali

A perforated screen, long used in Indian buildings, that lets air and light through while cutting glare. GD Towers is wrapped in terracotta jali panels.

GRC and UHPC

Glass-fibre reinforced concrete and ultra-high-performance concrete, both used for thin, shaped facade panels. The petal modules of our Dahlia concept are conceived in GRC, UHPC or aluminium.

Parametric facade

A facade whose pattern is set out by rules rather than drawn piece by piece. On Dahlia, petal modules follow a Fibonacci spiral from one corner, with the gaps between them set by the sun path. Read why your office elevation is your brand.

Heat-reflective paint

Exterior paint that reflects more of the sun’s heat, keeping walls and the rooms behind them cooler. The walls of the ABS Marine Services headquarters are finished in heat-reflective coolant paint.

03

Buildings, Drawings and Documents

The words on the drawings, the reports and the contracts.

PEB (pre-engineered building)

A steel building whose frame is designed and made in a factory and bolted together on site. It is common for factories and warehouses because it goes up quickly. See factory buildings.

Control building

The building that houses the control room of a substation, a metro line or a plant, with the offices, storage and staff spaces around it. See control building design.

GFC drawings

Good for construction drawings: the final, coordinated set issued to the contractor to build from, once the design and the approvals are settled.

BOQ (bill of quantities)

A list of every item of work and material with its quantity, used to get comparable prices from contractors and to keep track of cost. On the Atomberg office, the BOQ was ready before work began on site.

PPR and DPR

A preliminary project report is a first study of the site, the rules, the market and the money, enough to make a decision. A detailed project report develops it once the project goes ahead. See project feasibility reports.

04

Green Building Ratings

The three ratings used for commercial buildings in India.

IGBC

The Indian Green Building Council, part of the Confederation of Indian Industry, and its green building ratings. It lists more than 20,000 registered projects in India. See green building statistics for India.

GRIHA

Green Rating for Integrated Habitat Assessment, the rating from TERI and the Government of India, written for Indian conditions.

LEED

Leadership in Energy and Environmental Design, the US Green Building Council’s rating, used worldwide. Multinational tenants often ask for it.

A Note on the Rules

Building rules change. The definitions here follow the Tamil Nadu Combined Development and Building Rules, 2019 as published on 4 February 2019, with the October 2026 changes noted where we know of them. Amendments since 2019 have changed some limits, so check the current rule for your own plot, or ask us to: a feasibility report does exactly that before you commit to a site. Last checked on 23 November 2026.

Planning a building in India?

Tell us about your site, and we will tell you what the rules allow

Fields marked * are required.

Sending opens WhatsApp with your details written out. Press Send there and it reaches the studio directly.

How we handle your details: Privacy Policy

Have questions?

WhatsApp us
CallWhatsAppEnquire